400kV CABLE WORKS
Cables will be supplied by Heliopolis and in some cases issued by Main Contractor
Cables shall be handled and stored according to the manufacturer’s recommendations and installed as per Clients requirements.
Since these being very dedicated cables special care will be taken during the installation of these cables always under stringent supervision of Client, Consultant and Main Contractor (Normally the cable supplier/manufacturer)
Related works associated Horizontal Directional Drilling, Construction of Ducts, Joint Pits etc.
For EHV Cables above 132kv, cables will be laid in specially made Concrete Cable Troughs surrounded by CBS materials